St. John Fisher Walkway

In stock
SKU
BXMW/STJ-WALK
POA

The St John Fisher can also accommodate side panels to one side form a partially enclosed walkway.

A simple contemporary structure offering a cantilever design with uprights down one side only. This is ideal for applications where two rows of uprights cannot be accommodated due to obstructions (E.g Existing services near a building, Doorways, Windows etc). Corners and bends can be easily accommodated using hip joints.


Options:

  • Side Panels in PETg or Glazed Finish
  • Opal Cladding on the roof and side panels
  • Powder Coating to a wide range of colours
  • UPVC or Aluminium Guttering
  • LED lighting or solar lighting
  • Full installation service

Features:

  • ClearView PETg UV roof cladding
  • Submerged fixing
  • Robust, tough construction

Construction:

  • Welded end frames and purlin section made from heavy duty box section assembled with anti-tamper high strength bolts
  • Hot dipped galvanized

Delivery Message

Broxap offer a standard carriage service for all products, this usually takes between 3-28 days as lead times vary on specific products and quantities.

Recent Case Studies

The London School of Hygiene and Tropical Medicine is at the forefront of research and study into public…

Innovative design studio, Upcircle, were chosen by the University of Plymouth to create a scheme for a…

Working closely with DSM Demolition Ltd, Broxap helped in the creation of a temporary community hub.

View More Case Studies